Contract Forecast Notice - Supply of supply of equipment and materials for construction of substations 400/110 kV Leskovac-2 & Vranje-4


RS-Belgrade: IPA — supply of equipment and materials for construction of substations 400/110 kV Leskovac-2 & Vranje-4
2011/S 99-160974
Location: Europe (non-EU) — Serbia
Contract forecast notice
Supplies
Common procurement vocabulary (CPV):
Main object:
45232221 Transformer substation
Additional object(s):
31682540 Substation equipment
 1.Publication reference:
EuropeAid/131497/C/SUP/RS.
 2.Procedure:
Open.
 3.Programme:
IPA.
 4.Financing:
Budget line.
 5.Contracting authority:
European Union, represented by the European Commission, on behalf of and for the account of the beneficiary country, Belgrade, SERBIA.
 6.Nature of contract
 7.Contract description:
The supply contract will be implemented for the construction of the substations 400/110 kV Leskovac-2 and Vranje-4.
The subject of the contract shall be the manufacture, delivery, unloading, commissioning and after-sales service, of the following supplies:
Lot 1:
1 power transformer 300 MVA 400/110 kV with OLTC, 1 unit, autotransformer type for solidly earthed network for Leskovac-2 substation; and 1 power transformer 300 MVA 400/110 kV with OLTC, 1 unit, autotransformer type for solidly earthed network for Vranje-4 substation.
Lot 2:
High voltage equipment, relay protection control & monitoring and metering system, telecommunications, auxiliary supply and diesel generator set and LV and control cables for Vranje-4 substation, which is air-insulated type consisting of: 2 × 400 kV OHL bays, 1 × 400 kV bus coupler bay, 1 × 400 kV power transformer bay (main 1 and main 2), 400 kV bus-bars tubular type, 6 × 110 kV OHL bays, 1 × 110 kV bus coupler bay, 1 × 110 kV power transformer bay and 110 kV bus-bars (main 1 and main 2).
The beneficiary is Elektromreža Srbije Transmission System Operator (TSO) of Serbia.
 8.Numbers and titles of lots:
The contract is divided into lots:
Yes, number of lots: 2.
Lot 1: power transformers for Leskovac-2 and Vranje-4 substations.
Lot 2: plant and equipment for Vranje-4 substation.
 9.Budget
 10.Intended timing of publication of procurement notice:
June 2011.
 11.Additional information
 12.Legal basis:
IPA 2010.
 13.Date of dispatch of this notice:
11.5.2011.

Remarks:
There must be a minimum period of 30 calendar days between the publication of this contract forecast and the publication of the corresponding procurement notice.
No applications or requests for information should be sent at this stage.

For more details visit TED website OR click on the link here to view NIT

No comments:

Next Power Sector Event

Recent Tenders in Power

Make your own