General : GT12109600
Bond: 300,000.00
Issue Date: 28/06/12
Bid Closing Date: 12/08/12
Location:
Contracts Dept. - Operations Division, Qatar
Petroleum, PO Box 3212, Royal Plaza,G Wing,4th Floor Rm G13,Doha
Fee: 500.00
Bond Validity: 09/01/13 - (150) days from the Bid
Closing Date
Offer Validity: 10/12/12 - (120) days from the Bid
Closing Date
Scope of Work/Description:
The Scope of Work includes the following on EPIC
basis within Dukhan
Township : -Replacement of
existing window type A/C units in 3 B/R houses. -Replacement of existing split
type A/C units in Dukhan
English School .
-Replacement of existing cold room chiller at Dukhan Recreation Centre. - Replacement
of the existing ice making machine at Dukhan Water Sports Club and replacement
of existing pool heaters at Dukhan Recreation Centre. -Installation/application
of thermal insulation with aluminium cladding for various sizes of exposed
chilled water piping on the roof of Dukhan Operation Management Building (DOMB)
-EPIC of Two (2) 110T Chillers, Six (6) AHU's and Chilled Water Pipe Network
and Associated Equipment Works in Dukhan Medical Center -EPIC of Two (2)
Chiller Rooms, One (1) Freezer Cold Cold Room Units and Associated Electrical
and Civil Works for Cold Room Building in Fahahil Stripping Plant
For more details visit Qatar Petroleum website
No comments:
Post a Comment