Sonatrach International Petroleum Exploration and Production Corporation (SIPEX – Libyan branch) will issue a call for tender for one (01) drilling rig to fulfill its drilling program of four (04) exploration onshore wells in Area 95/96, Ghadames Basin, Libya.

Sonatrach International Petroleum Exploration andProduction Corporation (SIPEX – Libyan branch) will issue a call for tender for one (01) drilling rig to fulfill its drilling program of four (04) exploration onshore wells in Area 95/96, Ghadames Basin, Libya.

SIPEX LB invites all interested drilling contractors- local and international- specialized in onshore oil and gas drilling to submit their complete pre-qualification documents for registration and evaluation.

Drilling is planned to start on May, 2011.
Interested contractors are invited to provide the following informations:
 General information: Name, Address, country, Contact person, Position, Phone, Fax, Email,
 Company legacy status,
 All registration documents of the company,
 Financial statement for the last three years,
 Track record and performances,
 Company organization chart
 QHSE certifications and statistics for last three years.
 Capability to supply complete equipment and services requested.
 Previous or actual dispute
The Pre-qualification required documents should be presented to the following address, under hard (Paper) and soft (CD) copy forms, before Septembre 12th 2010 at 1600 pm.
SIPEX Libyan Branch
Kaab Ibn Malek Street, Bin Ashur area. TRIPOLI. LIBYA
Phone: + 218 21 363 5927/+ 218 21 363 5937
Fax: + 218 21 363 5952


· The pre-qualification request is not an invitation to tender. All responses will be treated without any engagement from SIPEX Libyan Branch.
· The ITT will only be issued to companies that have been pre-qualified
· SIPEX Libyan Branch keep the right to check all the information provided in the pre-qualification documents.
· SIPEX Libyan Branch may include site visits by its representative.
Well design
·         Conductor pre-set
·         26'' hole -18 5/8 casing to 200 ft.
·         17 1/2 hole-13 3/8 casing to 1600 ft
·         12 1/4 hole-9 5/8 casing to 4600 ft
·         8 1/2 hole-7 casing to 6750 ft
·         6 hole- 4 1/2 liner to 7400 ft.
Summary of technical's requirements
 Drilling rig 1500HP,SCR powered, depth rating to 15 000 ft.
 Derrick gross nominal capacity of 1000 000 lbs mini, with static hook capacity of 750000lbs and height enough for storage stands of three drill pipes
 Tope drive 1000 HP. Electric AC drive. 350 tons rated load capacity.
 Two (02) triplex pumps 1600 HP each.
 5000 psi 13 5/8 BOP stack
 Three High speed shale shakers. Desander, Desilter
 2200 bbls capacy mud system
 1600 bbls water storage
 Rotary table opening size 37 1/2
 12 000 ft of DP 5'' G105
 5 000 ft of DP 3 1/2 G105
 6 DC 9 1/2
 24 DC 8
 24 DC 6 1/2
 24 DC 4 3/4
 Stabilizers
 Fishing equipments
 Crane 40t
 Forklift 12 t
 Casing handling equipments
 Telecommunication system
Contractor:
 Responsible for Rig Move, transportation and landing.
 Rig camp full equipped for 80 persons approximately.
 Rig site camp for the key crew.
 Keep in consideration to minimize the number of rig down in big packs for traveling by flat areas.
 Keep in consideration the pre-build up of on wheels units like compressors, generators etc.
 Keep in consideration the fast setting up of electric alimentation and instrumentation cables,
 Keep in consideration the fast setting up of camp.
 Have a good HSEQ performance.
 Comply with minimum specifications required in the tender.
 Track record and performances.
 Telecommunication System.


استبيان  QUESTIONNAIRE

ANSWER
QUESTIONS
No
هل الشركة عضو في IADC
Is your Company an IADC member?
01
عمر الحفارة
Age of the rig
02
منشأ صناعة الحفارة
Origin of the drilling rig
03
عمر المخيم
Age of the camp
04
منشأ المخيم
Origin of  the camp
05
خبرة    في ليبيا أو ما يشابه ذلك خارج ليبيا
Company’s experience in libyan desert conditions or equivalent aboard
06
مدة تحريك الحفارة إلى منطقة 95/96 المتواجدة بحوض غدامس
Time to mibilize rig area 95/96, Ghadames basin, Libya
07
تاريخ آخر تفتيش الحفارة (أنبوب)
Date of last tubular inspection
08
آخر تاريخ تفتيش الحفارة و نهاية التفتيش أي شهادة الاعتماد
Date of last inspection by a third party and ceritifcation
09
تقديم شهادات الخبرة و السيرة الذاتية للعناصر ذوي الخبرة و الاختصاص
List of senior and junior personnel
10
نظام التدريب للعاملين على الحفارة
Company training grid for rig personnel
11
الثلاث المشغلين الآخرين بما في ذلك العقود و مدتها
Last three operators and duration of contract including area of work
12


No comments:

Next Power Sector Event

Recent Tenders in Power

Make your own