Bid Bond: QR 200,000.00
Issue Date: 16/08/10
Bid Closing Date: 26/09/10
Location: Contracts Dept. - Engineering Division, Qatar Petroleum, PO Box 3212, Mezzanine Fl, Room A-M03,B-Ring Rd, Doha
Fee: QR 200.00
Bond Validity: 23/02/11 - (150) days from the Bid Closing Date
Offer Validity: 24/01/11 - (120) days from the Bid Closing Date
Scope of Work/ Description: Provision of FEED Services for PART I - "ADDITIONAL AFTER-COOLERS FOR RECYCLE GAS COMPRESSORS IN ERU AT GAS RECYCLING PLANT" to enable QP to install facilities required to debottleneck existing Ethane Recovery Unit to ensure raw NGL production of 75000-77000 BBL/Day having C1/C2 ratio within specified 1% is achieved during summer months. PART II - "HEAVY ENDS RECOVERY FOR FLARE GAS AT GAS RECYCLING PLANT" to enable QP to install facilities as mentioned below: 1.,, Recovery of heavy ends from the HP Flare Gas in a cost effective way in order to reduce environmental smoke emission in HP Flare to MoE stipulated limit of Ringlemann index of 1. 2.,, To replace the produced water flash drum with an adequately sized vessel to handle increased water production from Gas Recycling Plant.
Fore more details visit Qatar Petroleum website or click on the link here to view tender details.
No comments:
Post a Comment