Search Tenders | Search Tender Opportunities | NIT- RFQ - Global Tenders - "Tender Mill"

Sunday, May 22, 2011

Qatar Petroleum General Tender Notice for EPIC for 16” Jet A1 Pipeline from QP Refinery to BSV-3

Type: General, GT11106200 
Bond: 5,000,000.00
Issue Date: 16/05/11
Bid Closing Date: 03/07/11
Location:
Contracts Dept. - Engineering Division, Qatar Petroleum, Fareej Bin Dirham,Al-Handasa Complex, Mezzanine Fl, Room A-M03,B-Ring Rd, Doha
Fee: 500.00
Bond Validity: 30/11/11 - (150) days from the Bid Closing Date
Offer Validity: 31/10/11 - (120) days from the Bid Closing Date

Scope of Work/Description:
"EPIC of 16'' Jet A1 Fuel P/L from QP Refinery to BSV-3" Engineering, procurements/supply & construction of a dedicated system for the supply of JET A1 fuel from QP Refinery to BSV-3 by 16 inch dia. pipeline. The estimated length of the pipeline between QP Refinery and BSV-3 is about 36.0 km. The system also includes new pumping system (3 nos. Booster pumps & 3 nos. Mainline pumps will be installed in a new pump house inside QP-Refinery) & associated facilities. Jet A1 Fuel is currently transported by a multi-product transfer system consisting of a pump station at the QP Refinery in Mesaieed, a 12 inch multi-product pipeline and a tank farm at Doha Depot situated in the Abu Hamour area on the southern outskirts of the city of Doha, via intermediate station BSV-3. From Doha Depot, it is transported to the existing airport by tankers. A new 18 inch multi-product pipeline, currently under pre-commissioning, will be used to transfer multi-products to Doha Depot. A new 16" Jet A1 Fuel pipeline from BSV-3 to STATION C-1 INSIDE NDIA is under EPIC stage and it is being constructed under contract ref. GC09106100 by DOPET. Under this contract, QP is laying an estimated 16.5 km of 16 inch internally and externally coated buried pipeline from BSV-3 to STATION C-1 INSIDE NDIA including temporary Pig Launching facility and Tie-in to existing 12 inch multi-product pipeline at BSV3 & pig receiving facilities, filtration, separation, metering facilities with Satellite and Equipment room at STATION C-1 INSIDE NDIA. Since the condition of existing 12 inch multi-product pipeline from QP Refinery to BSV-3 is not known, QP has decided to lay the proposed new approximately 36 KM long & 16'' dia. Jet A1 pipeline from QP Refinery (at Mesaieed) to BSV-3. Based on the above, purchase order has already been placed by QP for 16" line pipe API 5LX 60, 7.9 mm wall thickness for the Jet A1 Fuel pipeline project. The line pipe will be Free Issue Material for the EPIC Contractor.

For further details visit Qatar Petroleum website OR click on the link here to view NIT

No comments:

Next Power Sector Event

Recent Tenders in Power

Make your own