S. No. | Published on | Title and Ref. No. | Name of Orgn. |
|
|
1 | 25-Jul-2011 | Augmentation of Plant Capacity-Power Supply Package - Package-2F for Enhancement of Production Capacity to 10 Mtpa of Bolani Ores Mines
RMD-K-PROJ-BOM-NIT-10-12-042.DTD.22.07.2011 | Steel Authority of India Limited - Raw Materials Division |
|
2 | 25-Jul-2011 | Procurement of 60hp, 125hp and 150hp Kirloskar make pumps
THDC/Tehri/MM/366/25 | THDC India Ltd. |
|
|
3 | 25-Jul-2011 | Proc of STEEL TUBE SEAMMLESS 38 MM OD X 35 MM ID
20110247/PV/2405/OT/F | Ordnance Factory Board |
|
|
4 | 26-Jul-2011 | COOLING WATER TREATMENT PROGRAMME AND UTILIZATION OF TREATED EFFLUENT WATER AS MAKE UP and AS PER OUR SPECIFICATION AND TENDER DETAILS
RBRM11V051 | Indian Oil Corporation Limited |
|
|
5 | 26-Jul-2011 | Design Supply Installation and Commissioning of Tank Farm Management System TFMS at Rajkot Depot.
GSO/ENG/PT-03/RAJDP/TFMS/11-12 | Indian Oil Corporation Limited |
|
|
6 | 26-Jul-2011 | CIVIL STRUCTURAL PIPING AND ALLIED JOBS FOR REPLACEMENT OF HAMMER BLIND VALVES WITH PRESSURE BALANCE TYPE PLUG VALVES IN OFF SITE AREA OF HALDIA REFINERY.
HMLAS11060 | Indian Oil Corporation Limited |
|
|
7 | 26-Jul-2011 | Drilling of 2 Nos Bore hole with casing and proper grouting at 8 D38 L and 2A Dip37 L for pumping or dewatering from under ground to surface at Kumbharkhani UG
wn4650-min-0015-2011-12 | Western Coalfields Limited |
|
|
8 | 26-Jul-2011 | Miscellaneous mechanical Equipment AND piping works for FCCU revamp project during shutdown 2011 at Mathura Refinery.
MRCC11M051/166 | Indian Oil Corporation Limited |
|
|
9 | 26-Jul-2011 | Soil Investigation work at Damodar River HB Ch. 419.00 KM and Rupnarayanpur River HB Ch. 448.50 KM in Haldia-Mourigram Rajbandh Barauni Pipelines
HMRBTS0911 | Indian Oil Corporation Limited |
|
|
10 | 26-Jul-2011 | PROCUREMENT OF PIPELINE LOCATOR
GAIL/BDA/34035/3200072171/CANDP/ID-011/11 | GAIL (India) Limited |
|
|
11 | 27-Jul-2011 | PROCUREMENT OF SAFETY VALVES LHS RHS FOR BOILER DRUM and SUPER HEATER OF BOILER AS DETAILS IN ENQUIRY and DATA SHEET.
RHRM1R3021 | Indian Oil Corporation Limited |
|
12 | 27-Jul-2011 | PROCUREMENT OF SAFETY VALVES FOR BOILER DRUM IBR COMPANION FLANGES AS DETAILS IN ENQUIRY and DATA SHEET.
RHRM0R3258 | Indian Oil Corporation Limited |
|
|
13 | 27-Jul-2011 | PROVISION OF ONE NO. 70 KL TANK WITH ALLIED FACILITIES AT LOBP ASAOTI.
LOBP/ENGG/LT-137/TANK/2011-12 | Indian Oil Corporation Limited |
|
|
14 | 27-Jul-2011 | Blank for Wheel Dia-630 as per Drawings and Technical Instructions.
ACD-HMB-11-SF-1597-T-440 | Heavy Engineering Corporation Limited |
|
|
15 | 27-Jul-2011 | Design Engineering Manufacturing Fabrication Inspection and Testing and Supply of Bayonet Type Heat Exchanger and Propylene Vaporizer 18N E 209 at and nbspIOCLs Mathura Refinery for and FCCU AND PRU Revamp Project at Mathura U.P India.
SPC/0785/000/MR/0610/06/1034 | Indian Oil Corporation Limited |
|
|
16 | 28-Jul-2011 | SS Piping for HAC system at 508 building for Project P3A
BARC/NRBK/0042/HACS/TR/622/2011 | Bhabha Atomic Research Centre, Kalpakkam |
|
|
17 | 28-Jul-2011 | 25 MVA (420/22 KV) Station Transformer including its protection panel for NJHPS
SJVN/ECD/Transformer- NJHPS/11 | Satluj Jal Vidyut Nigam Limited |
|
|
|
With regards, |
No comments:
Post a Comment