S. No. | Published on | Title & Ref. No. | Name of Orgn. |
|
|
|
|
|
|
1 | 8-Aug-2011 | ARC FOR MISCELLANEOUS MECHANICAL MAINTENANCE WORK ASST. AT HVJ-DVPL-VDPL COMP STATION AT GAIL VIJAIPUR
GAIL/VH/11/C037/MECH | GAIL (India) Limited |
|
|
|
|
|
2 | 8-Aug-2011 | DESIGN ENGINEERING MANUFACTURING FABRICATION AND SUPPLY OF METHANOL UNDER GROUND STORAGE VESSEL
GAIL/VL/11/M028/MECH | GAIL (India) Limited |
|
|
3 | 9-Aug-2011 | SEAMLESS STELL LINE PIPE
SDG2775P12 | Oil India Limited |
|
|
|
4 | 9-Aug-2011 | Fabrication and SUPPLY OF 03 NOS. OF FLOATS FOR HEAT EXCHANGERS OF HEERA
N15MC11007 | Oil and Natural Gas Corporation Ltd |
|
|
5 | 9-Aug-2011 | 5 AXIS CNC MACHINING CENTRE
BDL/CC/OT/GT/007/2011-2012-1 | Bharat Dynamics Limited |
|
|
|
6 | 10-Aug-2011 | Construction of 12 well field header at well location of Bech-107at Bech GGS-II
EZ11C11024 | Oil and Natural Gas Corporation Ltd |
|
|
7 | 10-Aug-2011 | Procurement,Inspection and commissioning enquiry of Heat Tracer Replacement System Including Engineering Design,Detail Engineering Inspection and commissioning requirement of the system at ONGC Uran Plant, Uran
UP14C11005 | Oil and Natural Gas Corporation Ltd |
|
|
8 | 10-Aug-2011 | Procurement of VALVES
E1CSC11006 | Oil and Natural Gas Corporation Ltd |
|
|
9 | 10-Aug-2011 | DESIGN, MANUFACTURE, SUPPLY, ERECTION,TESTING AND COMMISSIONING OF 3T EOT UNDERSLUNG CRANE FOR GENERAL STORE
MAT/PRM/0063/11 | Cochin Shipyard Limited |
|
|
|
|
|
|
|
|
| |
10 | 12-Aug-2011 | SILIS/HOPPERS INCLUDING WASHING SYSTEM AND INTERNAL BLENDING TUBES FOR LLDPE/HDPE FOR PC-II
A096/T-073/11-12/RJ/40 | GAIL (India) Limited |
|
|
11 | 12-Aug-2011 | LAYING OF FEEDER LINE FOR JIPPL FROM DVPL-II AT JAGOTI
GAIL/KCS/12/50/3300042823/JIPPL | GAIL (India) Limited |
|
|
12 | 13-Aug-2011 | Fabrication fitment of Mechanical Steering locking arrangement in 21 nos.Dumpers ( 8 nos. for 120T dumper, 5 nos. for CAT 100T Dumpers and 8 nos. for Komatsu 100T Dumpers)
jntex0117a | Northern Coalfields Limited (NCL), Singrauli |
|
|
13 | 13-Aug-2011 | GEOCHEMICAL SURVEY IN KUTHALAM AREA (ONSHORE) OF CAUVERY BASIN
M26HL11002 | Oil and Natural Gas Corporation Ltd |
|
|
14 | 13-Aug-2011 | Composite repair of 36 inch dia. Crude oil pipeline of Trombay-Jawahar Dweep crude oil pipeline of ONGC Uran plant.
UP17C11006 | Oil and Natural Gas Corporation Ltd |
|
15 | 13-Aug-2011 | Civil Works at Drill Site 344 Z (Re-entry) in Lakwa Area.SH:Construction of main and ancillary foundation,internal hardening,ring bund and approach road etc
RC2AC11028(ShortOpenTender) | Oil and Natural Gas Corporation Ltd |
|
16 | 13-Aug-2011 | LTO-3 Tape Data Cartridges
B21HL11008 | Oil and Natural Gas Corporation Ltd |
|
17 | 13-Aug-2011 | Construction of FOUNDATION,OTHER ANCILLARY WORKS,INTERNAL HARDENING, APPROACH ROAD,CROSS DRAINAGE WORK AND POST RIG BUILDING WORKS FOR ELECTRICAL RIG AT DRILL SITE UBAD IN NORTH GANDHAR
AC21C11011 | Oil and Natural Gas Corporation Ltd |
|
18 | 13-Aug-2011 | Fabrication and SUPPLY OF STRAINERS FOR BCPA- 2 and BCPB- 2 UNDER BPA and BPB PROCESS COMPLEX
QY11L11009 | Oil and Natural Gas Corporation Ltd |
|
19 | 13-Aug-2011 | Construction of NEW ROAD (106.50 M) FROM KVK-GCS TO FLARE POINT AREA AND CONNECTING THE ADJACENT OLD DRILL SITE ROAD (45 MTR.)TO FLARE POINT AREA FOR THE MOVEMENT OF HEAVY FIRE FIGHTING VEHICLE AT ONGC,KVK-GCS,KALAPPAL
VC1CC11076Dated5thAug,2011 | Oil and Natural Gas Corporation Ltd |
|
With regards, |
No comments:
Post a Comment