General: GT11111100
Bond: 400,000.00
Issue Date: 25/08/11
Bid Closing Date: 09/10/11
Location:
Contracts Dept. - Engineering Division, Qatar
Petroleum, Fareej Bin Dirham, Al-Handasa Complex, Mezzanine Fl,Room A-M31,
B-Ring Rd, Doha
Fee: 500.00
Bond Validity: 07/03/12 - (150) days from the
Bid Closing Date
Offer Validity: 06/02/12 - (120) days from the
Bid Closing Date
Scope of Work/Description:
Front-End Engineering Design (FEED) For
Telemetry System Replacement / Upgrade for MM & BH Fields All Wellhead
Jackets and Real time Data Transmission to Onshore (Doha) The objective of this
project is to carry out Front End Engineering Design (FEED) to achieve the
following: 1),,Replace all existing RTU/MTU with a state-of-art latest
technology telemetry system which can improve maintenance efficiency, provide
flexibility in engineering & configuration, provide advanced operator
functions and create an integrated operational environment by a seamless &
direct interface with Yokogawa DCS (CS 3000 R3.08), on production stations.
2),,Provide telemetry facility on other existing wellhead jackets that do not have
RTU installed on them, at present. 3),,Create a centralised monitoring, control
and operation facility in the existing Yokogawa DCS at each Production Station
PS-2 & PS-3 for all wellhead jackets associated with BH and MM Fields,
respectively. 4),,Provide a data monitoring system by implementing real time
data transfer from offshore wellhead facilities and test separators to Doha end
user's office (PD, FD) via advanced surveillance tools and dashboard
applications by modifying/replacing the existing Wellhead Data Monitoring
System located in end user's (PD, FD) office at Doha.
No comments:
Post a Comment