General: GT11112200
Bond: 160,000.00
Issue Date: 29/09/11
Bid Closing Date: 27/11/11
Location:
Contracts Dept. - Engineering Division, Qatar
Petroleum, Fareej Bin Dirham,Al-Handasa Complex, Mezzanine Fl, Room
A-M03,B-Ring Rd, Doha
Fee: 500.00
Bond Validity: 25/04/12 - (150) days from the
Bid Closing Date
Offer Validity: 26/03/12 - (120) days from the
Bid Closing Date
Scope of Work/Description:
The Scope of the EPIC contract is to prepare a
detailed design for relocation of the Common Seawater Facility (CSF) Control
Room, from ground floor to first floor of the existing control building, and to
execute the relocation works including; detailed engineering, procurement,
construction, installation, testing and commissioning works. The scope
comprises extension / upgrade of the existing training room to create a new CSF
Control Room including addition of a new VIP entrance to the Control room,
comprising of a new escape stair, VIP elevator and upgrade of the existing
ground floor entrance area to VIP standards. The upgrade of the existing
training room also includes Civil, Architectural, Building Services, Telecom/LV,
Loss Prevention systems and Instrumentation works. Existing control equipment
will be relocated from the ground floor to the new CSF control room on the
first floor where new control consoles and new monitors will be provided and
connected/interfaced with the existing systems.
For more details visit Qatar Petroleum Website
No comments:
Post a Comment