General
: GT12108800
Bond:
3,500,000.00
Issue
Date: 10/06/12
Bid
Closing Date: 22/07/12
Contracts
Dept. - Engineering Division, Qatar Petroleum, Fareej Bin Dirham,Al-Handasa
Complex, Mezzanine Fl, Room A-M03,B-Ring Rd, Doha
Fee:
500.00
Bond
Validity: 19/12/12 - (150) days from the Bid Closing Date
Offer
Validity: 19/11/12 - (120) days from the Bid Closing Date
Scope
of Work/Description:
-
SCOPE OF WORK IS LISTED COMPRISES OF FOLLOWING 3 PARTS A),,NEW BERTH FOR MARPOL
RECEPTION FACILITIES The scope of the proposed New Berth for MARPOL comprises
of : 1),,Building one concrete block quay wall berth, 135m long with scar ends
on both sides to facilitate future extension. 2),,Receiving point with trench
for receiving Slop from Ships. 3),,Marine furniture including Cylindrical
Fenders, Bollards, Mooring Hooks and Ladders. 4),,Navigation Lights 5),,High
Mast area lighting for the entire plot including aggregate staging area and
future development area. 6),,Asphalt roads for access and within the plot.
7),,Traffic signal light system. 8),,Grading of the entire Barge aggregate
area. 9),,Provision of Oil Spill Boom. B),,REPAIR OF NEW SERVICE BERTH NO. 4,,
The scope for the repair of New Service Berth No.4 comprises of the following:
1),,Build block type quay wall 82m in length in front of existing service berth
no.4 with berth furniture ( fenders , ladders , bollards ,etc.) , identical to
the repair of service berth No.5 (GT081165). 2),,Extend the utilities (potable
water & diesel) to the new dispensing points on the new Quay wall from the
dispensing points at existing Berth No.4. Extend the bulk dispensing pipe
sleeves to the new berth from existing berth no.4. 3),,Provide block pavement
and surface drainage for adjoining area developed upon relocation of Quay wall.
4),,Provide High Mast area lighting for the new Quay wall / berth area.
5),,Provide new Fenders, Mooring rings and Bollards at the new berth.
C),,CONSTRUCTION OF BUND AT WAKRA DOCK The scope for the construction of bund
wall at Wakra dock comprises the following: 1),,Building bund of approximate
length 1.33 Km by supplying and placing of quarry run with weight from 1 to
500kg, procured from local quarries. The sea side face shall be protected from
wave action with Armour rock of 100 to 500 Kgs. The top 0.2 m of the bund shall
be gravel 20-50 mm for easy grading and safe vehicles movement.