Notice Dated: 18.07.2011
Cairn Energy India
Pty Ltd. (“CEIL”) is the Operator on behalf of its Joint Venture Partners
namely Cairn Energy Hydrocarbons Limited and Oil and Natural Gas Corporation
(ONGC) for the Contract Area RJ-ON-90/1 at Barmer in the State of Rajasthan
(Block). The Block contains a number of major oil discoveries namely Mangala,
Bhagyam, Aishwariya, and other fields. The Mangala field is the largest onshore
oil discovery in India since 1985. The Mangala field is currently producing
125,000 bopd and the developments of Bhagyam and Aishwariya are progressing
well. Mangala Processing Terminal (MPT) is the common processing hub for
Mangala, Bhagyam, Aishwariya and other smaller fields.
CEIL proposes to
augment the capacity of MPT by addition of Crude Storage Tanks (2 nos),
Settling tanks (2 nos), Pumps and Metering skid and related facilities
(“Project”). In view of this expansion of MPT, CEIL on behalf of its Joint
Venture Partners seeks an Expression of Interest under International
Competitive Bidding Process (“ICB”) from reputed contractors (Indian & International) with demonstrated performance
for prequalification to participate in ICB process for the execution of the
Project on EPC basis.
Broad scope for the
successful Contractor shall include verification of the Front End Engineering
and Design (FEED) Package, Detailed Engineering, Procurement, Expediting,
Inspection, Testing, Construction, Installation, Pre-commissioning,
commissioning and Performance Testing. Major facilities to be developed under
this Project are:
2 Nos of Fixed roof
Settling Tanks (approx 32.7 metres ID X 12 metres height each) as per API 650
including Steam Heating Coil and Internals, External Degassing Boot in
accordance with the design provided.
2 Nos of Electric
Motor driven vertical can type Export Oil Booster Centrifugal Pumps (100 m3/hr
to 350 m3/hr flow range and DP of 515 kPa) with associated auxiliaries, piping,
valves, instrumentation and electrical systems.
2 Nos of Export Oil Pipeline Centrifugal Pumps (100
m3/hr to 350 m3/hr flow range and DP of 6838 kPa) with associated auxiliaries,
lubricant oil and seal system, piping, valves, instrumentation, vibration
monitoring, UCP and electrical systems.
Tank bottom
circulation pumps.
Custody Transfer
Metering Skid (175,000 bopd) with sphere ball prover and dedicated controls.
All civil works
associated with tanks including bund walls. structural and mechanical works,
piping, electrical, instrumentation, controls, telecom, F&G and fire
fighting works as required.
Interfacing of the
new equipment with the existing system.
Structural adequacy
checks and modifications to accommodate new piping .
Last date for submission of EOI: within 14 calendar
days of this notice
Contact details:
Director – P&SCM
Cairn Energy India Pty Limited
Ground Floor, Tower A, Paras Twin Tower, Sector
Road
Sector 54, Gurgaon -122 002 (Haryana), India
Tel.: 0091-124-476 4000 Fax : 0091-124-476 4568