Notice Dated:
18.07.2011
Cairn Energy India
Pty Ltd. (“CEIL”) is the Operator on behalf of its Joint Venture partners namely
Cairn Energy Hydrocarbons Limited and Oil and Natural Gas Corporation (ONGC)
for the Contract Area RJ-ON-90/1 at Barmer in the State of Rajasthan (Block).
The Block contains a number of major oil discoveries namely Mangala, Bhagyam,
Aishwariya, and other fields. The Mangala field is the largest onshore oil
discovery in India since 1985. The Mangala field is currently producing 125,000
bopd and the developments of Bhagyam and Aishwariya are progressing well.
Mangala Processing Terminal (MPT) is the common processing hub for Mangala,
Bhagyam, Aishwariya and other smaller fields.
CEIL proposes to
augment the capacity of the MPT by addition of Steam Boilers, Steam Turbine
Generator, Condensate Handling and Filtration System, Electric Power Distribution System and all
related auxiliaries (“Project”). In view of this expansion of MPT, CEIL on
behalf of its Joint Venture Partners seeks an Expression of Interest under
International Competitive Bidding Process (“ICB”) from reputed contractors
(Indian &International) with demonstrated performance for prequalification
to participate in ICB for the execution of the Project on EPC basis.
Broad scope for the
EPC Contractor shall include verification of the Front End Engineering and
Design (FEED) Package, Detailed design, Procurement, Expediting, Inspection,
Testing, Construction, Installation, Pre-commissioning, Commissioning and
Performance Testing. Major facilities to be developed under this Project are:
Extraction and
Condensing Steam Turbine Generator (1 no) 12 MW, 11 kV complete with lube oil
system, gland vent condenser, associated HP steam piping from boiler to
turbine, condensate piping, electrical systems, control system, field
electrical and instrumentation and its integration with existing similar units.
Air cooled Condensor
(1 no) for the above STG complete with structural assembly, finned coils, inlet
ducting, condensate evacuation system, associated hot well, cold well pumps,
electricals, instrumentation and controls as applicable.
3 Nos of Electrical
Substation buildings along with associated 33 KV/ 11 KV/ 6.6 KV/ 415 V Power and distribution transformers, HV/LV
panels, tie-in modifications to existing HV/LV panels, UPS, Battery charger, Power
Management System modifications for integrated seamless operation with existing
systems.
3 Nos of Control
Rooms (in the same building as the above substation) for housing control &
Instrumentation Systems for the above supply and its integration with existing
control system for the scope of supply.
Additions to the
existing steam condensate and filtration system.
All civil
construction, structural, mechanical, piping, electrical, instrumentation,
control, telecom, F&G, clean agent
system and fire fighting works as required.
Structural adequacy
checks and modifications to accommodate the new piping, electrical and instrument
cables.
Statutory approvals
from Boiler Inspector and Electrical authorities as applicable
Last date for submission of EOI: within 14 calendar
days of this notice
Contact details:
Director – P&SCM
Cairn Energy India Pty Limited
Ground Floor, Tower A, Paras Twin Tower, Sector
Road
Sector 54, Gurgaon -122 002 (Haryana), India
Tel.: 0091-124-476 4000 Fax : 0091-124-476 4568
For more details
visit Cairn India website
Source: Internet
No comments:
Post a Comment