Notice Dated:
18.07.2011
Cairn Energy India
Pty Ltd. (“CEIL”) is the Operator on behalf of its Joint Venture Partners
namely Cairn Energy Hydrocarbons Limited and Oil and Natural Gas Corporation
(ONGC) for the Contract Area RJ-ON-90/1 at Barmer in the State of Rajasthan
(Block). The Block contains a number of major oil discoveries namely Mangala,
Bhagyam, Aishwariya, and other fields. The Mangala field is the largest onshore
oil discovery in India since 1985. The Mangala field is currently producing
125,000 bopd and the developments of Bhagyam and Aishwariya are progressing
well. Mangala Processing Terminal (MPT) is the common processing hub for
Mangala, Bhagyam, Aishwariya and other smaller fields.
CEIL proposes to
augment the capacity of the MPT by addition of Water Injection Pumps, Heat
Exchangers, Filters, Vapour Recovery Blowers and Compressors, Fuel Gas System
and Piping Header Modifications (“Project”). In view of this expansion of MPT,
CEIL on behalf of its Joint Venture Partners seeks an Expression of Interest
under International Competitive Bidding (“ICB”) process from reputed
contractors (Indian & International) with demonstrated performance for
pre-qualification to participate in ICB process for execution of the work on
EPC basis.
Broad scope for the
successful Contractor shall include verification of the Front End Engineering
and Design (FEED) package, Detailed Design, Procurement, Expediting,
Inspection, Testing, Construction, Installation, Pre-commissioning,
Commissioning and Performance Testing of the Project. Major facilities to be
developed under this Project are:
1 No. Injection Water
Booster Pump skid with vertical can type pump package (Electric Motor driven),
capacity ranging from 350 m3/hr to 1400 m3/hr, and differential pressure
ranging from 500 kpa to 1000 kpa and its integration with existing similar
units.
3 Nos of Injection
Water Main Pump Skids with capacity ranging from 350 m3/hr to 800 m3/hr with differential pressure ranging from 7000
kpa to 12000 kpa and its integration with existing similar units.
1 No. Injection
water–steam heat exchanger.
Vapour Recovery
Compressor and blowers skid with associated auxiliaries like coolers, lube,
seal oil system and its integration with existing similar units.
Modifications to the
exiting fuel gas, flare, steam systems.
All associated civil,
structural, mechanical, piping, electrical, instrumentation and control,
telecom, F&G and fire fighting works as required.
Structural adequacy
checks and modifications to accommodate the new lines.
Last date for submission of EOI: within 14 calendar
days of this notice
Contact details:
Director – P&SCM
Cairn Energy India Pty Limited
Ground Floor, Tower A, Paras Twin Tower, Sector
Road
Sector 54, Gurgaon -122 002 (Haryana), India
Tel.: 0091-124-476 4000 Fax : 0091-124-476 4568
For more details
visit Cairn India website
Source: Internet
No comments:
Post a Comment