General: GT11109100
Bond: 2,000,000.00
Issue Date: 11/07/11
Bid Closing Date: 28/08/11
Location:
Contracts Dept. -
Engineering Division, Qatar Petroleum, Fareej Bin Dirham, Al-Handasa Complex,
Mezzanine Fl,Room A-M31, B-Ring Rd, Doha
Fee: 500.00
Bond Validity: 25/01/12 -
(150) days from the Bid Closing Date
Offer Validity: 26/12/11 -
(120) days from the Bid Closing Date
Scope of Work/Description:
The Contract scope is
EPIC for Integrtated Oily Water / Sludge Handling System, New Drain System,
Fire Protection for Crude Manifold and Pipeline Replacement at Halul. The Scope
is segregated into six systems which are- System 1: Replacement of the offshore
portion of the 24" produced water disposal line to sea, System 2: Sludge
mitigation/handling system for Crude Oil Storage Tanks, System 3: Refurbishing
API Pit or Providing New one at Halul & Oily water drain system, System 4:
Fire protection of the crude oil manifold, System 5: Replacement of the
12" PS-1 (OPQL) crude oil line from Pig Receiver to the manifold and
System 6: Provision of internal kerb walls within North and South Tank Farms
For more details visit Qatar Petroleum
website
Source: Internet
No comments:
Post a Comment