General
: GT12106000
Bond: 650,000.00
Issue Date: 19/04/12
Bid Closing Date: 17/06/12
For more details visit Qatar Petroleum website
Bond: 650,000.00
Issue Date: 19/04/12
Bid Closing Date: 17/06/12
Location:
Contracts
Dept. - Operations Division, Qatar Petroleum, PO Box 3212, Royal Plaza,G
Wing,4th Floor Rm G13,Doha
Fee:
500.00
Bond
Validity: 14/11/12 - (150) days from the Bid Closing Date
Offer
Validity: 15/10/12 - (120) days from the Bid Closing Date
Scope
of Work/Description:
The
Work to be performed by Contractor includes provision of all necessary
resources to undertake the engineering, procurement, installation and
commissioning of three (3) centrifugal type air compressor packages, two (2)
air dryer packages and associated facilities at QP Refinery, Mesaieed.
No comments:
Post a Comment