Asian Development Bank
Contract No.: ICB-01: Airside Infrastructure and Landside Terminal Improvement at TIA,
Simikot and Rara Airports
The Civil
Aviation Authority of Nepal hereinafter referred to as the "Employer"
intends to prequalify firms for the following works ("the Works")
under this project under loan from Asian Development Bank.
ICB-01: Component-A: Airside Infrastructure at
TIA will include:
·
Land preparation for parallel taxiway,
international apron, hangar areas for Nepal Airlines, Domestic Airlines and
Nepal Army;
·
300 m extension of runway;
·
Pavement works of runway, taxiways and apron;
·
Drainage works for runway strip, taxiway strip
and apron area;
·
Installation of power supply system and
aeronautical lighting system,
·
Installation of water supply system, sewage
treatment plant and solid waste disposal system; and
·
Provision of Foam Tender
ICB-01:
Component-B: Landside Terminal at TIA will include:
·
Reconfiguration and refurbishment of existing
international terminal building; and
·
Construction of new domestic terminal building
ICB-01:
Component-C: Works at Simikot and Rara Airports will include:
·
Construction of terminal building with tower at
both airports
·
Pavement of runway and apron, and drainage works
at Rara airport
·
Installation of ATC communication and
meteorological equipment
·
Provision of snow plough
Bid Document Fee: Nepalese Rupees 7,500/-
Deadline for Bid submission: 12th October
2011, 2:00 P.M.
Contact Details:
Attention: Project Director
P.O. Box 284, Sinamangal, Kathmandu, Nepal
TIA Improvement Project Directorate
Kathmandu,
Country: Nepal
Country: Nepal
Telephone: +977 - 1 - 446 – 6665
Facsimile number: +977 - 1 - 447 – 7410
For more details visit Asian Development Website
or click on the link here to view NIT
No comments:
Post a Comment